Environment
Information
Management Plans
:: Environmental
:: Mining
:: Other
Licences and
Approvals
South East Open Cut
Links
News
Contact Us
Ashton Coal
Operations Limited
Glennies Creek Road
Camberwell NSW 2330
P.O. Box 699
Singleton NSW 2330
Tel:02 65 761 111
Fax:02 65 761 122
Environmental Hotline:
1800 657 639
Environmental Plans
(All documents are available by contacting
Ashton Coal on (02) 6576 1111)
2769_SSMP : Soil Stripping Management Plan
Uploaded: 30/01/2008 Size: 0.126Mb
Soil Stripping Management Plan
2775_Bushfire A.doc
Uploaded: 31/01/2008 Size: 0.113Mb
Bushfire Management Plan
2778_Waste : Waste Management Plan
Uploaded: 31/01/2008 Size: 0.099Mb
Waste Management Plan
2783_RRCMP A.doc
Uploaded: 31/01/2008 Size: 0.092Mb
Road and Rail Closure Management Plan
2786_Lighting A.doc
Uploaded: 31/01/2008 Size: 0.094Mb
Lighting Management Plan
3055_Spon Com A.doc
Uploaded: 31/01/2008 Size: 0.119Mb
Spontaneous Combustion Management Plan
Air Quality Management Plan
Uploaded: 5/09/2006 Size: 0.339Mb
Plan designed to manage the air quality issues effecting ACOL including noise and dust
Air Quality MP Figure 1
Uploaded: 5/09/2006 Size: 2.778Mb
figure 1 Air Quality Management Plan
Air Quality MP Figure 2
Uploaded: 5/09/2006 Size: 3.238Mb
Figure 2 from the Air Quality management plan
Archaeology and Cultural Heritage Management Plan
Uploaded: 5/09/2006 Size: 0.186Mb
Plan designed to manage the aboriginal heritage sites located across ACOL land
Archaeology Figure 1
Uploaded: 5/09/2006 Size: 1.067Mb
Archaeological sites located across ACOL land
Blast and Vibration Management Plan
Uploaded: 5/09/2006 Size: 0.178Mb
Plan designed to manage the impacts of blasting in the ACOL open cut pit
Blast and Vibration MP Figure 1
Uploaded: 5/09/2006 Size: 3.246Mb
Figure showing the location of blast monitoring units
Bushfire - Fig 1.pdf
Uploaded: 8/6/2004 Size: 0.186Mb
Bushfire management plan figure 1
Environmental Management Strategy
Uploaded: 27/07/2009 Size: 0.281Mb
Ashton Coal Environmental Management Strategy Phase 2 Underground Mining Operations
Environmental Management Strategy Figure 1
Uploaded: 27/07/2009 Size: 1.490Mb
Ashton Environmental Management Strategy Figure 1
Environmental Management Strategy Figure 2
Uploaded: 27/07/2009 Size: 1.911Mb
Ashton Environmental Management Strategy Figure 2
Erosion and Sediment Control Management Plan
Uploaded: 5/09/2006 Size: 0.165Mb
manages the reduction of erosion and the control of sediment resulting from erosion
Flora and Fauna Management Plan
Uploaded: 5/09/2006 Size: 0.199Mb
Management of the flora and fauan located within ACOL Land
Flora and Fauna MP Figure 1
Uploaded: 5/09/2006 Size: 0.970Mb
Figure showing the proposed vegetation coridors on ACOL land
Land Management Plan
Uploaded: 5/09/2006 Size: 0.160Mb
Indicates how ACOL will effect the current land shape and how they will manage the final outcome
Land MP Figure 1
Uploaded: 5/09/2006 Size: 0.855Mb
Shows the final land form of the Open Cut Pit
Land MP Figure 2
Uploaded: 5/09/2006 Size: 0.970Mb
Shows the proposed vegetation corridors
Landscape and Revegetation Management Plan
Uploaded: 5/09/2006 Size: 0.190Mb
Proposed rehabilitation of the ACOL site
Landscape and Revegetation MP Figure 1
Uploaded: 5/09/2006 Size: 0.303Mb
Final vegetation communities of the area
Landscape and Revegetation MP Figure 2
Uploaded: 5/09/2006 Size: 0.867Mb
Top of dump layout
Noise Management Plan
Uploaded: 5/09/2006 Size: 0.154Mb
designed to mitigate the noise emitted from ACOL site
Noise MP Figure 1
Uploaded: 5/09/2006 Size: 3.230Mb
noise monitoring locations
RRCMP Fig 1.pdf
Uploaded: 8/6/2004 Size: 0.851Mb
road and rail closure figure
Site Water Management Plan
Uploaded: 5/09/2006 Size: 0.208Mb
manage all forms of water coming onto the site and produced from operations
Site Water MP Figure 1
Uploaded: 5/09/2006 Size: 2.794Mb
river catchments
Site Water MP Figure 2
Uploaded: 5/09/2006 Size: 2.797Mb
Water sampling sites and ACOL dams
Soil_Strip-Fig 1
Uploaded: 6/10/2006 Size: 0.836Mb
Soil_Strip-Fig 1
Soil_Strip-Fig2
Uploaded: 27/11/2003 Size: 0.691Mb
Soil_Strip-Fig2
Soil_Strip-Fig3
Uploaded: 27/11/2003 Size: 4.325Mb
Soil_Strip-Fig3
Weed Management Plan
Uploaded: 5/09/2006 Size: 0.095Mb
manage and remove weed infestations across ACOL land
Weed MP action plan
Uploaded: 5/09/2006 Size: 0.040Mb
action plan for weed control
Weed MP Figure 1
Uploaded: 5/09/2006 Size: 2.760Mb
known listed weed infestations
© Copyright 2003 Ashton Coal Project Limited |
Email Us