Environment
Information
Management Plans
Licences and
Approvals
South East Open Cut
Reports
Links
News
Contact Us
Ashton Coal
Operations Limited
Glennies Creek Road
Camberwell NSW 2330
P.O. Box 699
Singleton NSW 2330
Tel:02 65 761 111
Fax:02 65 761 122
Environmental Hotline:
1800 657 639
SE Open Cut Reports
(All reports are available by contacting
Ashton Coal on (02) 6576 1111)
South East Open Cut Preliminary Environmental Assessment (PEA)
Uploaded: 26/11/2009 Size: 8.095Mb
Premlinimary Environmental Assessment for the South East Open Cut
VOL1 SEOC EA CONTENTS
Uploaded: 26/11/2009 Size: 0.16Mb
Main Contents of the EA
VOL1 SEOC EA EXECUTIVE_SUMMARY
Uploaded: 26/11/2009 Size: 1.06Mb
Executive Summary
VOL1 SEOC EA SECTION_1
Uploaded: 26/11/2009 Size: 4.28Mb
EA Main Text Section 1
VOL1 SEOC EA SECTION_2
Uploaded: 26/11/2009 Size: 0.16Mb
EA Main Text Section 2
VOL1 SEOC EA SECTION_3
Uploaded: 26/11/2009 Size: 0.17Mb
EA Main Text Section 3
VOL1 SEOC EA SECTION_4
Uploaded: 26/11/2009 Size: 16.70Mb
EA Main Text Section 4
VOL1 SEOC EA SECTION_5_PARTA_211109
Uploaded: 3/12/2009 Size: 31.34Mb
EA Main Text Section 5 - Part A (Section 5 has been split into Part A and Part B to minimise individual file sizes)
VOL1 SEOC EA SECTION_5_PARTB_211109
Uploaded: 3/12/2009 Size: 24.05Mb
EA Main Text - Section 5 - PART B
VOL1 SEOC EA SECTION_6
Uploaded: 26/11/2009 Size: 0.15Mb
EA Main text Section 6
VOL1 SEOC EA SECTION_7
Uploaded: 26/11/2009 Size: 2.85Mb
EA Main text Section 7
VOL1 SEOC EA SECTION_8 - 9
Uploaded: 26/11/2009 Size: 0.17Mb
EA Main text Section 8 and 9
VOL1_Appendix 01A - Property Schedule
Uploaded: 26/11/2009 Size: 0.12Mb
Appendix 1A
VOL1_Appendix 01B - DGRs
Uploaded: 26/11/2009 Size: 0.64Mb
Appendix 1B
VOL1_Appendix 02 - Existing ACP Consent and EPL
Uploaded: 26/11/2009 Size: 0.90Mb
Appendix 2
VOL2 A3 PLANS_PART A
Uploaded: 3/12/2009 Size: 18.69Mb
Volume 2 A3 Plans - This volume has been broken into Parts A, B, C and D.
VOL2 A3 PLANS_PART B
Uploaded: 3/12/2009 Size: 19.59Mb
Volume 2 A3 Plans - Part B
VOL2 A3 PLANS_PART C
Uploaded: 3/12/2009 Size: 26.41Mb
VOLUME 2 A3 PLANS - PART C
VOL2 A3 PLANS_PART D
Uploaded: 3/12/2009 Size: 21.04Mb
Volume 2 A3 Plans - Part D
VOL3_Appendix 03 - Air Quality and Greenhouse Gas Assessments
Uploaded: 26/11/2009 Size: 23.62Mb
Appendix 03
VOL3_Appendix 04 - Noise and Blasting Assessment
Uploaded: 26/11/2009 Size: 38.13Mb
Appendix 4
VOL3_Appendix 05 - Groundwater Assessment
Uploaded: 26/11/2009 Size: 34.01Mb
Appendix 05
VOL4_Appendix 06 - Surface Water and Flooding Assessment
Uploaded: 26/11/2009 Size: 72.28Mb
Appendix 6
VOL4_Appendix 07 - Glennies Creek Geomorphology
Uploaded: 26/11/2009 Size: 6.06Mb
Appendix 7
VOL4_Appendix 08 - Soil Land Capability Agricultural Suitability
Uploaded: 26/11/2009 Size: 2.41Mb
Appendix 8
VOL4_Appendix 09 - Geochemistry
Uploaded: 26/11/2009 Size: 2.91Mb
Appendix 9
VOL4_Appendix 10 - Flora and Fauna Assessment
Uploaded: 26/11/2009 Size: 5.76Mb
Appendix 10
VOL4_Appendix 11 - Aquatic Ecology
Uploaded: 26/11/2009 Size: 5.78Mb
Appendix 11
VOL5_Appendix 12 - Visual Impact Assessment
Uploaded: 26/11/2009 Size: 20.05Mb
Appendix 12
VOL5_Appendix 13 - Aboriginal Heritage
Uploaded: 26/11/2009 Size: 29.85Mb
Appendix 13
VOL5_Appendix 14 - European Heritage
Uploaded: 26/11/2009 Size: 17.87Mb
Appendix 14
VOL5_Appendix 15 - Transport
Uploaded: 26/11/2009 Size: 3.02Mb
Appendix 15
VOL5_Appendix 16 - Hazard and Risk
Uploaded: 26/11/2009 Size: 6.26Mb
Appendix 16
VOL5_Appendix 17 - Economic Benefits
Uploaded: 26/11/2009 Size: 0.63Mb
Appendix 17
VOL5_Appendix 18 - Benefit Cost Analysis
Uploaded: 26/11/2009 Size: 0.14Mb
Appendix 18
© Copyright 2003 Ashton Coal Project Limited |
Email Us